- Subtasks can be a lot of things.
|
|
- Subtask → An step towards achieving the deliverables
|
|
- Job → Something that I need to remember to do
|
|
- Follow-up → Someone I need to talk to about something
|
|
- Action → After a meeting, an action can be placed on me that I need to complete.
|
|
- Scratchpad → A place for me to put my thoughts down
|
|
|
|
## Subtask Properties
|
|
→ Project ⇒ Pulled by templater from the folder that contains the note
|
|
→ Task ⇒ Pulled by templater from the folder that contians the note
|
|
→ Task Number ⇒ Prompted by templater at creation of note
|
|
→ Title ⇒ Prompted by templater at creation of note
|
|
→ Type: Subtask
|
|
→ Subtask Type ⇒ See list above
|
|
→ Date Created
|
|
→ Date Started
|
|
→ Date Due
|
|
→ Description
|
|
→ Priority ⇒ 0 (lowest) through 9 (highest)
|
|
→ Status ⇒ Not Started, Waiting, In Progress, Done
|
|
→ Done
|
|
|
|
## General Structure of Document
|
|
This type of document is left unstructured specifically so that it can capture a broad range of details regarding a particular way of achieving an end goal.
|