- Subtasks can be a lot of things.
- Subtask → An step towards achieving the deliverables
- Job → Something that I need to remember to do
- Follow-up → Someone I need to talk to about something
- Action → After a meeting, an action can be placed on me that I need to complete.
- Scratchpad → A place for me to put my thoughts down
Subtask Properties
→ Project ⇒ Pulled by templater from the folder that contains the note → Task ⇒ Pulled by templater from the folder that contians the note → Task Number ⇒ Prompted by templater at creation of note → Title ⇒ Prompted by templater at creation of note → Type: Subtask → Subtask Type ⇒ See list above → Date Created → Date Started → Date Due → Description → Priority ⇒ 0 (lowest) through 9 (highest) → Status ⇒ Not Started, Waiting, In Progress, Done → Done
General Structure of Document
This type of document is left unstructured specifically so that it can capture a broad range of details regarding a particular way of achieving an end goal.