- Subtasks can be a lot of things.
|
||||
- Subtask → An step towards achieving the deliverables
|
||||
- Job → Something that I need to remember to do
|
||||
- Follow-up → Someone I need to talk to about something
|
||||
- Action → After a meeting, an action can be placed on me that I need to complete.
|
||||
|
||||
## Subtask Properties
|
||||
→ Project ⇒ Pulled by templater from the folder that contains the note
|
||||
→ Title ⇒ Prompted by templater at creation of note
|
||||
→ Task Number ⇒ Prompted by templater at creation of note
|
||||
→ Type: Subtask
|
||||
→ Subtask Type ⇒ See list above
|
||||
→ Date Created
|
||||
→ Date Started
|
||||
→ Date Due
|
||||
→ Description
|
||||
→ Priority ⇒ 0 (lowest) through 9 (highest)
|
||||
→ Status ⇒ Not Started, Waiting, In Progress, Done
|
||||
→ Done
|
||||
|
||||
## General Structure of Document
|
||||
This type of document is left unstructured specifically so that it can capture a broad range of details regarding a particular way of achieving an end goal.
|
||||