- Subtasks can be a lot of things.
- Subtask → An step towards achieving the deliverables
- Job → Something that I need to remember to do
- Follow-up → Someone I need to talk to about something
- Action → After a meeting, an action can be placed on me that I need to complete.
## Subtask Properties
→ Project ⇒ Pulled by templater from the folder that contains the note
→ Title ⇒ Prompted by templater at creation of note
→ Task Number ⇒ Prompted by templater at creation of note
→ Type: Subtask
→ Subtask Type ⇒ See list above
→ Date Created
→ Date Started
→ Date Due
→ Description
→ Priority ⇒ 0 (lowest) through 9 (highest)
→ Status ⇒ Not Started, Waiting, In Progress, Done
→ Done
## General Structure of Document
This type of document is left unstructured specifically so that it can capture a broad range of details regarding a particular way of achieving an end goal.